REALIZATION OF A CLOSED BUILDING STRUCTURE WITH INSULATION SLUICE AROUND, INCLUDED EARTHWORKS, HYDRAULIC WORKS, GROUND CONNECTION AND IMPLEMENTATION OF PIPES AND CABLE DRAW-IN-BOX
Amount : 550.000 €
Description of works :
- Ballasted columns: 190 meters
- Prestressed concrete precast hollow slab : 145 m²
- Facing brick elevation masonry : 230 m²
- Polyisocyanurate insulation (PIR) of cavity walls : 230 m²
- Roofing with PUR insulation; EPDM tightness covered with alu coating: 190 m²